List Your Equipment  /  Dealer Login

Cedarapids Introduces MJ55 Jaw Module for Large Quarries

Wed April 22, 2020 - National Edition
Terex MPS


The structure includes oversize walkways, repositionable stairs and guard rails for safe access.
The structure includes oversize walkways, repositionable stairs and guard rails for safe access.
The structure includes oversize walkways, repositionable stairs and guard rails for safe access.  The module combines the JW55 jaw crusher, sloped hopper, Cedarapids 52x20 feeder and straight line conveyor on a galvanized steel structure.

Designed around its JW55 jaw crusher, the Cedarapids MJ55 modular jaw crusher is designed for large quarries or contractors that want a stationary type design without the complexity of a normal stick-built plant.

The module combines the JW55 jaw crusher, sloped hopper, Cedarapids 52x20 feeder and straight line conveyor on a galvanized steel structure.

The standard structure can be transported in standard shipping containers plus a flat rack for the crusher and can be bolted together quickly on site with basic tools.

The three configurations offered for the feed hopper allow for the optimum size to match up to the equipment that is being used to load the machine.

The structure includes oversize walkways, repositionable stairs and guard rails for safe access. Three plant emergency stops are placed conveniently around the platform for easy access during operation. Optional mounting feet allow for the basic unit to be installed on compacted gravel base.

The MJ55 comes with hydraulic CCS jaw adjustment controls but can be optioned up with the addition of the CCM switch gear panel. Additional options include a cross plant magnet and off plant conveyor starter kit.

For more information, visit www.terexmps.com.

This story also appears on Aggregate Equipment Guide.




Today's top stories

Jobseekers Leveraging Career Market for In-Demand Skilled Trades

Value in Remanufacturing Construction Equipment: Reduce Cost, Downtime, Carbon Footprint

Buckley, PennDOT Restore I-95 to Usefulness in Philly

Meta Plans to Build $800M Next-Generation Data Center in Montgomery, Ala.

Demolition Crews Bring Down Largest Span of Baltimore's Collapsed Key Bridge

Flo Engineering Restoring Access to Critical Highway in California

Webber Working to Complete $300M Texas Interchange Project

Bobcat Installs Innovative Stationary Fuel Cells From HyAxiom at Two of Its Facilities


 






aggregateequipmentguide-logo agriculturalequipmentguide-logo craneequipmentguide-logo forestryequipmentguide-logo truckandtrailerguide-logo
39.96250 \\ -83.00610 \\ Columbus \\ PA